PROJECTS IN THE MAKING (PDO SUBMITTED/ONGOING DEVELOPMENT):
|
| PROJECT: |
OPERATOR: |
CONCEPT: |
PROD. STARTUP:
|
INVESTMENTS (NOK):
|
| Oseberg Øst |
StatoilHydro |
New wells for IOR
|
2008 |
NOK 1,9 billion |
| Gimle |
StatoilHydro
|
Subsea tieback
to Gullfaks C;
|
2008 |
N/A |
| Vega |
StatoilHydro
|
Subsea to Gjøa |
2010 |
NOK 6,7 billion |
| Askeladd |
StatoilHydro
|
Subsea to Snøhvit |
2014/2015 |
N/A |
| Albatross |
StatoilHydro
|
Subsea to Snøhvit |
2007 |
N/A |
| Alvheim |
Marathon Oil |
Subsea to FPSO |
2008 |
NOK 9,2 billion |
| Statfjord Senfase |
StatoilHydro |
New 30" pipeline &
Statfjord A/B/C upgrade
|
2009 |
NOK 16,1 bilion |
| Oseberg Delta |
StatoilHydro |
Subsea to Oseberg |
2008 |
NOK 1,8 billion |
| Vilje |
StatoilHydro |
Subsea to Alvheim FPSO |
2008 |
NOK 2,5 billion |
| Gjøa |
StatoilHydro |
Standalone Semibsub |
2010 |
NOK 23,5 billion |
| Volund (Hamsun) |
Marathon Oil |
Subsea to Alvheim FPSO |
2009 |
NOK 2 billion |
| Alve Sør |
StatoilHydro |
Subsea to Norne |
December 2008 |
NOK 800 million |
| Varg Sør (Rev) |
Talisman Energy |
Subsea to Armada (UK) |
2008 |
NOK 1-1,5 billion |
| Yme |
Talisman Energy |
MOPU and storage tank |
2009 |
NOK 4,4 billion |
| Tyrihans |
StatoilHydro |
Subsea to Kristin |
2009 |
NOK 14 billion |
|
PROJECTS OF THE FUTURE (PDO PENDING/DEVELOPMENT IN PLANNING):
|
| PROJECT: |
OPERATOR: |
CONCEPT: |
PROD. STARTUP:
|
INVESTMENTS (NOK):
|
| Dagny |
StatoilHydro |
Subsea to Sleipner
|
Under evaluation
|
NOK 1,66 billion |
| Aurora |
StatoilHydro
|
Subsea to Gjøa
|
PDO 2014
|
N/A |
| Morvin |
StatoilHydro
|
Subsea to Kristin
|
PDO 2007
|
N/A |
Ekofisk Growth II
|
ConocoPhillips
|
New infrastructure
on Ekofisk South
|
2009 |
N/A |
Valhall
Redevelopment
|
BP
|
New field centre |
2010 |
NOK 7 billion
|
| Gudrun (15/3-4) |
StatoilHydro
|
Standalone or subsea to Sleipner, Alvheim or Miller (UK) |
PDO 2008
(Prod.2012/2013)
|
N/A |
| Skarv |
BP |
Subsea to FPSO |
PDO 2007.
Prod 2011
|
NOK 19 billion |
Eldfisk Upside
|
ConocoPhillips |
Two new wellhead platforms
|
2010 |
NOK 7 bilion |
| Goliat |
Eni Norge
|
Undecided |
PDO 2008
|
NOK 15 billion+ |
| Njord NV Flank |
StatoilHydro |
Subsea to Njord
|
2008 |
N/A |
| Oseberg |
StatoilHydro |
New Drilling Module |
2010? |
N/A |
| Frøy |
Pertra |
FPSO, jackup or subsea
to Heimdal |
Prod. 2011
|
N/A |
| Njord Gas Exp. |
StatoilHydro |
Platform upgrade
|
PDO 2007
|
NOK 1,2 billion |
Shetland Chalk
|
StatoilHydro |
Well from Oseberg |
2007 |
NOK 400 million |
| Astero |
StatoilHydro |
Subsea to Gjøa |
PDO 2009
|
N/A |
| Hild |
Total |
Subsea tieback to UKCS
|
PDO 2008
|
N/A |
|
POSSIBLE FUTURE PROJECTS:
|
| PROJECT: |
OPERATOR: |
CONCEPT: |
PROD. STARTUP:
|
INVESTMENTS (NOK):
|
| Nucula |
StatoilHydro |
N/A
|
N/A |
- |
| Ile/Tilje |
StatoilHydro
|
Tied back to Norrne FPSO |
2009/2010 |
- |
| Mim/Krabbe |
Talisman Energy
|
Subsea to Gyda |
N/A |
- |
Grane C
(25/11-16)
|
StatoilHydro
|
Subsea to Grane |
N/A |
- |
| 35/11-13 |
StatoilHydro
|
Subsea tieback to Troll B |
2012 |
- |
Emintrude
(15/6-9S)
|
StatoilHydro
|
Subsea to Sleipner, Volve
or Gudrun |
N/A |
- |
Trestakk
(6407/3-2)
|
StatoilHydro
|
FPSO, tieback to Aasgard A,
B or Kristin. Dual dev. with
6506/11-3 |
N/A |
- |
| 6506/11-3 |
StatoilHydro |
FPSO, tieback to Aasgard A,
B or Kristin. Dual dev. with
Trestakk
|
N/A |
- |
| Tjalve |
ConocoPhillips |
Subsea to Ekofisk Growth
Area Project |
Temporaril
postponed
|
- |
| Freja/Mjoelner |
Hess |
Subsea to Danish CS
|
N/A |
- |
| 25/5-5 |
Total Norge |
N/A. Possible subsea to
Heimdal |
N/A |
- |
Alpha Cook
|
StatoilHydro |
Possible well from
Vestflansken template. |
N/A |
- |
Valemon
|
StatoilHydro |
Subsea template to
Kvitebjørn |
N/A |
- |
| Lavrans |
StatoilHydro |
Subsea to Kristin |
N/A |
- |
| Onyx Sørvest |
Norske Shell |
Possibloe standalone dev. |
N/A |
- |
Tommeliten
Alpha
|
ConocoPhillips |
Subsea to Ekofisk |
2010 |
-
|
| Trym |
Norske Shell
|
Subsea toHarald (DK)
|
Temporarily
postponed
|
NOK 1,2 billion |
| Marulk |
Eni Norge AS |
N/A |
N/A |
- |
Ekofisk Sør
|
ConocoPhilips |
N/A |
N/A |
- |
Eldfisk II
|
ConocoPhillips |
N/A |
N/A |
- |
| Flyndre |
ConocoPhillips |
New wellhead platform
and subsea to Ekofisk
|
Temporarily
postponed
|
- |
|